Other Requirements:

Most projects require only those documents described above.   However some Building/Planning Departments require other documents.   Below if a list of some documents and when they be requested.   Please contact your local Building and Planning Departments regarding these requirements or have Anthony Home Design conduct a Feasibility Study:

Survey -   When building close to   your property line a survey may be requested.   Surveys must be conducted by a Surveyor licensed in the State of California.

Soils Report - When building on a hill or in other areas with specific geological conditions, the local Building Department may require a soils report be conducted by a Soils Engineer licensed in the State of California.

Grading Plan - When a large amount of soil is to be removed as part of the project the Building department may request a grading plan.

Stormwater Pollution Plan - When the project is going to occur during the rainy season and a significant amount of grading is to occur (usually 5 acres), the Planning Department may require a Storm Drainage Plan to ensure run-off from the site does not result in dirt and other contaminates being washed into the public sewers or waterways.

Arborist Report - When building adjacent to Heritage trees or other native trees, the planning department may require an Arborist Report to determine if the project will impact the health of the tree.

 

 

  Site Map